
Mace use Hoardfast Firescreen for crane protection
Westgate Global have worked with Mace, known as global experts in shaping the built environment, on numerous occasions, and with an excellent track record, we were consulted again.

Westgate Global have worked with Mace, known as global experts in shaping the built environment, on numerous occasions, and with an excellent track record, we were consulted again.

Having previously worked with Westgate Global to provide site offices and welfare facilities on a new build construction site at 22 Bishopsgate in London, Multiplex reached out to Westgate Global again to provide Hoardfast, a quality temporary…

Dust containment was a major consideration on this project due to there being a number of surrounding shops, live cafe area on the third floor and continued access to the general public, so Marshall (Building Contractors) Ltd needed a full enclosure including a ceiling that would stop any dust contamination throughout the rest of the building.

Internal freestanding hoarding was required during a project to restore the Cathedral’s organ. The organ and its pipe work needed to be dismantled and removed, whilst the Cathedral remained open for visitors.

Westgate Global were required to help deliver the design, supply and installation of a temporary corridor on two levels, which would link a new pier to the existing terminal whilst the terminal extension was still being fitted out.

For this project Flexiwall was recommended, designed and installed as it is durable enough for permanent applications yet can be easily reconfigured.

PD Ports approached various companies to find their solution and ultimately chose Westgate Global because of our competitive pricing, the superior quality of our product and our extensive experience in installing fabric partitioning solutions.

The DHL team at Daventry International Rail Freight Terminal (DIRFT) contacted Westgate Global for a partitioning solution to segregate storage of food and drink containers from non-food products.

From the start it was clear a full-height solid wall carried a number of complexities, including installation around the existing and multiple penetrations at high level.

Aperture Group required a solution to achieve segregation between production and storage areas for dust prevention and temperature control. Wind loads also needed to be taken into account as the partition was being installed beside external shutter…