
Internal site accommodation and welfare facilities for mac-group
Approximately 160 workers would be using these facilities, so they needed to be robust, yet clean and professional in appearance.

Approximately 160 workers would be using these facilities, so they needed to be robust, yet clean and professional in appearance.

Temporary internal site rooms were created using Hoardfast uPVC panels for their quality and freestanding nature.

Westgate Global were required to help deliver the design, supply and installation of a temporary corridor on two levels, which would link a new pier to the existing terminal whilst the terminal extension was still being fitted out.

For this project Flexiwall was recommended, designed and installed as it is durable enough for permanent applications yet can be easily reconfigured.

PD Ports approached various companies to find their solution and ultimately chose Westgate Global because of our competitive pricing, the superior quality of our product and our extensive experience in installing fabric partitioning solutions.

The DHL team at Daventry International Rail Freight Terminal (DIRFT) contacted Westgate Global for a partitioning solution to segregate storage of food and drink containers from non-food products.

From the start it was clear a full-height solid wall carried a number of complexities, including installation around the existing and multiple penetrations at high level.

Hoardfast Firescreen and uPVC were used to create both a cutting room and site offices.

Operating in the food and drink industry means that Kingsland Drinks must meet the requirements for BRC accreditation. Flexiwall helps with this as it is manufactured from food safe materials, delivers an over 99% dust tight seal and easily segregates production and storage areas.

Westgate Global were invited to install Flexiscreen to assist Kerry whilst installing a new production line without disrupting current manufacturing.