
Site offices and welfare spaces in new build skyscraper
Westgate Global provided Hoardfast uPVC to create: 40 toilet cubicles, 3 shower cubicles, a separate room to house urinals, sinks and hand dryers.

Westgate Global provided Hoardfast uPVC to create: 40 toilet cubicles, 3 shower cubicles, a separate room to house urinals, sinks and hand dryers.

Recognising the need for efficient site welfare accommodation, and effective dust and noise control measures during a specialist five floor office fit out project, Signature London asked preferred supplier, Westgate Global, to provide a solution…

Discover how Bearward Engineering partnered with Westgate Global to prevent factory dust contamination in their aluminum core manufacturing area. Learn about the innovative Flexiwall solution, operational flexibility, dust containment benefits, and…

DB Schenker, a leading logistics and transportation company, sought to optimise their warehouse operations by dividing their existing space into two distinct areas due to new contracts awarded. The primary objectives were to address concerns related…

As part of their commitment to environmental sustainability and compliance with stringent regulations, the company recognised the need to segregate hazardous waste and minimise the dispersion of dust particles within their facility. To address these…

Unitspark, a leading wastewater management company, faced the challenge of contamination control at their Basingstoke sewage cake barn. To protect their equipment from potential damage caused by contaminants, Unitspark decided to implement Flexiwall…

Flexiwall fabric partition was installed to help minimise the sound within the work area. Westgate Global were able to reduce the decibels in this area by 21.9db.

The successful collaboration between Westgate Global and ISG enabled DB Schenker to create a temperature-controlled area within their new warehouse facility. The installation of Flexiwall and mesh Anchorwall provided DB Schenker with a flexible…

Loop Technology recognised the need for a controlled environment to support their Advanced Automated Preforming Technology (AdAPT) composite preforming demonstration cell. To address the challenge of containing composite fibres and preventing them…

Due to soaring demand and raw material price rises, the cost of plasterboard has risen more than 15% this year. And that’s on top of an almost 100% rise in costs throughout 2022.