
Mace use Hoardfast Firescreen for crane protection
Westgate Global have worked with Mace, known as global experts in shaping the built environment, on numerous occasions, and with an excellent track record, we were consulted again.

Westgate Global have worked with Mace, known as global experts in shaping the built environment, on numerous occasions, and with an excellent track record, we were consulted again.

BW are a fit out and refurbishment company who work with occupiers, asset managers and consultants to deliver workplaces with a personal touch. BW were working on a London fit out project in a 6 storey office development at 1 Finsbury Avenue…

Having previously worked with Westgate Global to provide site offices and welfare facilities on a new build construction site at 22 Bishopsgate in London, Multiplex reached out to Westgate Global again to provide Hoardfast, a quality temporary…

Westgate Global were required to help deliver the design, supply and installation of a temporary corridor on two levels, which would link a new pier to the existing terminal whilst the terminal extension was still being fitted out.

The DHL team at Daventry International Rail Freight Terminal (DIRFT) contacted Westgate Global for a partitioning solution to segregate storage of food and drink containers from non-food products.

Westgate Global were approached to provide internal site hoarding to shield the ongoing renovations from customers as the airport remained fully open whilst the project was underway.

Westgate Global installed Flexiwall as an ideal solution for meeting BRC hygiene standards, having a dust tight seal and a unique v-overlap made it the perfect product to use for this project.

Morgan Sindall had been contracted by Heathrow Airport Ltd and British Airways to modernise hangars at the West London airport in preparation for the arrival of the new airbus. This will allow greater flexibility of working space during maintenance…

Westgate Global was called in by NFT Distribution to create a partition in a new build chilled warehouse at Tilbury Docks. This requirement had been driven by a new contract that required part of the existing warehouse to operate at a colder temperature.