Hoardfast® Firescreen fire-rated hoarding

Designed for fit-out, refurbishment and maintenance projects in live environments, Hoardfast Firescreen separates active construction from operational areas, controlling dust, limiting access and maintaining fire compliance.

Request a call back

Step 1 of 6

Which product are you enquiring about?
Please select from the options

Hoardfast Firescreen benefits

Manufactured from white steel-faced, mineral wool-filled composite panels, Firescreen is available in 30-minute (EI30) and 60-minute (EI60) fire ratings, certified to EN 13501-1 A2-s1-d0. It enables contractors to create fire-compliant barriers, internal site rooms and welfare spaces.

Westgate Icon_Flame Resistant

Certified fire performance

Meet EI30 and EI60 fire resistance ratings in commercial, healthcare, retail and public settings.

Westgate Icon_QUICK_INSTALL

Quick, modular installation

Fast installation, demounting, and relocation using tongue and groove, push-fit connection method.

Westgate Icon_SOUND_NOISE

Acoustic and thermal protection

Mineral wool-filled panels reduce the impact of noise and provide thermal insulation.

Westgate Icon_Free-standing

Flexible configurations

Install floor-to-ceiling for full fire protection, or as a free-standing system for non-combustible hoarding.

Westgate Icon_Reconfigure

Reusable and relocatable

Panels can be demounted and reinstalled across project phases, reducing waste and improving environmental performance.

Westgate Icon_Access Options

Create internal site rooms

Create temporary site offices and welfare spaces directly in the project zone.

Fire-rated internal hoarding

Create temporary, fire-compliant barriers using Hoardfast® Firescreen to segregate live construction from operational areas, maintaining safety and continuity throughout.

HOARDFAST IN ACTION

Watch the video and learn more about Hoardfast

HOARDFAST IN ACTION

Watch the video and learn more about Hoardfast

See how Hoardfast is installed, and understand the benefits it brings when creating temporary site accommodation or dust containment hoarding during fit out and refurbishment works. 

Our news

amazon-flexiscreen2

Flexiscreen

Flexiscreen protects critical Amazon logistics operations during construction works

Tabbed_Flexiwall_1

Insights

Movable vs demountable vs relocatable partitions: the differences explained

Leeds-1-1240×930

Hoardfast Firescreen

Hoarding solution maintains customer experience during huge airport transformation

JDR_cables_04

Flexiscreen

Temporary Flexiscreen enclosure protects live production area during construction works

Unilever – Port Sunlight7

Hoardfast

90m Hoardfast and Flexiwall combine to provide dust-tight partition wall at Unilever Port Sunlight, preventing cross-contamination between production lines

Acciona (29)

Flexiscreen

When cladding design delays threatened to delay the £1.2 billion transformation of Edmonton EcoPark, Flexiscreen ensured the project stayed on track.

Need some help?


Fill in the enquiry form and we’ll contact you to discuss.

Or call us now to find out how we can help.

We’re here to talk anytime Monday to Friday, from 7.30am to 4.30pm.

+44 (0)1785 242181