An engineered hoarding solution: Passenger safety, fire-load and dust control
Having worked with Farrans on a £400m airport transformation in Bristol, Westgate Global was invited to the site to conduct a full site survey. The team specified Hoardfast Firescreen, a steel-faced, mineral wool-filled composite hoarding panel, with a 60-minute (EI60) fire rating.
The 150 metre-long hoarding was crowd-loaded to 7.4 kilonewtons per metre at a height of 1.2 metres, creating safe passenger corridors that could withstand knocks, bumps, and pressure in busy areas.
The panels connect using a tongue-and-groove push-fit system. In addition to making them quick to mount and demount, the design created a secure, dust-tight seal that protected passengers from construction dust and disruption. Where dust was especially critical, the team ran sheeting from floor to ceiling.
Reusability, security, and project agility

No two areas were quite the same. While much of the hoarding was installed using concrete ballasts on the construction side, the team adapted the specification to suit the older building. In tight spots where a freestanding system wouldn’t fit, they clamped the hoarding to existing handrails, minimising its footprint without compromising protection.

With hundreds of operatives working just the other side of the hoarding from passengers, security was vital. The steel-faced panels rose above passengers’ reach, with fine mesh netting running up to the soffit so that nothing could be passed or dropped from one side to the other.

On the passenger side, the panels have a smooth, clean white finish that is ideal for vinyl, giving the airport a blank canvas for its own signage and graphics. Once branded, the hoarding can pass for a permanent wall, so that travellers see a clean, professional finish instead of a building site.
The modular, relocatable panels were also key to Farrans’ phased approach. As each stage was completed, the hoarding was quickly dismantled and moved on to the next, with runs of up to 150 m at a time, reducing cost and waste across the project.
A safe, compliant divide
Throughout Phase 2, passengers at Leeds Bradford Airport have continued to move safely past extensive construction works, with the hoarding providing a safe, compliant divide between the live airport and the site at every stage.
Because the same system has moved with the works from one stage to the next, the airport has avoided the cost and waste of buying new hoarding for each phase. The fast-fit design ensured the hoarding’s installation and relocation didn’t impact the project schedule. In an airport environment, where plans can change at short notice, Westgate Global’s extensive sector experience meant the team mobilised quickly and adapted as the airport’s needs evolved.