Project delay protection screens

Westgate Global delivers tailored weather and dust screening to protect live environments, shield open structures and maintain clean, controlled conditions. We keep mission critical projects on track without disrupting operations. 

delay lower

Expert tailored solutions

Mission critical environments cannot afford disruption or delay. Open façades expose internal works to wind, rain and temperature instability. At the same time, construction generates airborne dust that can migrate into the environment, affecting critical path processes, people, and equipment.  

Westgate Global delivers temporary integrated weather protection and dust containment screens that seal exposed structures and separate active works from live environments. Our engineered screening maintains safe, dry, and dust-controlled conditions – achieving ISO 7 cleanroom standard – throughout every phase of our customer’s project. Quick to install and reusable across phases, our screening provides a proven, consistent solution that reduces risk and keeps projects on schedule.  

Project delay prevention products

Flexiscreen®

Flexiscreen is an engineered temporary weather protection and dust screen proven to shield open buildings from inclement weather and regulate temperature. Flexiscreen installs quickly, enables active construction processes to be carried out, reducing the risk of operational delays.

  • Weather protection and thermal insulation
  • Reduce noise and prevent dust spread
  • Achieve ISO 7 cleanroom standard
  • Reusable across project phases
  • No mess, quick/clean installation
  • Takes up minimal floor space

Why our solutions for project delay prevention

We prevent project delays by delivering engineered protection screens that shield sites from disruption and keep critical construction moving.

Global Expertise Icons_Assurance

We protect momentum

We install temporary screens that seal exposed structures fast, preventing weather-related stoppages and keeping internal works progressing to schedule.

Global Expertise Icons_Live Environment Protection

We won’t slow you down

Our screens install quickly on live sites, creating controlled environments without interrupting adjacent works, operations or critical activities.

Global Expertise Icons_Safety & Compliance

We adapt to change

Modular easy-to-install panels can be moved and reconfigured as projects evolve, protecting your project against disruption at every phase.

Global Expertise Icons_Risk & Delay Reduction

We remove risk

We eliminate delays caused by wind, rain and moisture ingress, protecting materials, maintaining safe conditions and safeguarding programme timelines.

Global Expertise Icons_End-to-end Project Management

We take responsibility

From design through installation and sign-off, we manage your project end-to-end, reducing the technical issues that can cause delays.

Global Expertise Icons_World Class Product Range

We design for performance

Our durable, reusable screens deliver consistent protection in demanding conditions, helping prevent downtime and maintain project continuity.

FLEXISCREEN IN ACTION

Watch the video and learn more about Flexiscreen®

FLEXISCREEN IN ACTION

Watch the video and learn more about Flexiscreen®

See how Flexiscreen is installed, and understand how it weather protects your live site during construction works.

Our news

Tabbed_Flexiwall_1

Insights

Movable vs demountable vs relocatable partitions: the differences explained

Leeds-1-1240×930

Hoardfast Firescreen

Hoarding solution maintains customer experience during huge airport transformation

JDR_cables_04

Flexiscreen

Temporary Flexiscreen enclosure protects live production area during construction works

Unilever – Port Sunlight7

Hoardfast

90m Hoardfast and Flexiwall combine to provide dust-tight partition wall at Unilever Port Sunlight, preventing cross-contamination between production lines

Acciona (29)

Flexiscreen

Flexisceen offers emporary weather protection on one of London's biggest construction sites

Unilever – Port Sunlight7

Heat load containment

Reusable, pre-engineered hot aisle containment helps deliver consistent heat load testing and cuts installation time by half compared with traditional methods.

Need some help?


Fill in the enquiry form and we’ll contact you to discuss.

Or call us now to find out how we can help.

We’re here to talk anytime Monday to Friday, from 7.30am to 4.30pm.

+44 (0)1785 242181