
Site offices and welfare spaces in new build skyscraper
Westgate Global provided Hoardfast uPVC to create: 40 toilet cubicles, 3 shower cubicles, a separate room to house urinals, sinks and hand dryers.

Westgate Global provided Hoardfast uPVC to create: 40 toilet cubicles, 3 shower cubicles, a separate room to house urinals, sinks and hand dryers.

In the dynamic and challenging environment of construction, providing proper welfare facilities is not just a legal requirement; it’s a vital component in ensuring the health, safety, and wellbeing of workers.

Creating a safe environment and reducing dust where possible for customers and staff, as well as ensuring that the shop’s aesthetic appeal was maintained throughout, was key to this project’s success. Westgate Global recommended to use Hoardfast…

A maintenance and renovation works project on a ground floor entrance door, at one of London’s premier shopping centres, required internal and external site hoarding. The hoarding solution needed to weathertight the façade, contain dust and…

Recognising the need for efficient site welfare accommodation, and effective dust and noise control measures during a specialist five floor office fit out project, Signature London asked preferred supplier, Westgate Global, to provide a solution…

In the dynamic and challenging environment of construction, providing proper welfare facilities is not just a legal requirement; it’s a vital component in ensuring the health, safety, and wellbeing of workers.

DB Schenker, a leading logistics and transportation company, sought to optimise their warehouse operations by dividing their existing space into two distinct areas due to new contracts awarded. The primary objectives were to address concerns related…

Flexiwall fabric partition was installed to help minimise the sound within the work area. Westgate Global were able to reduce the decibels in this area by 21.9db.

The successful collaboration between Westgate Global and ISG enabled DB Schenker to create a temperature-controlled area within their new warehouse facility. The installation of Flexiwall and mesh Anchorwall provided DB Schenker with a flexible…

Due to soaring demand and raw material price rises, the cost of plasterboard has risen more than 15% this year. And that’s on top of an almost 100% rise in costs throughout 2022.