Terex Equipment keep finished products clean with a factory partition wall Flexiwall
Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

BW are a fit out and refurbishment company who work with occupiers, asset managers and consultants to deliver workplaces with a personal touch. BW were working on a London fit out project in a 6 storey office development at 1 Finsbury Avenue…

Having previously worked with Westgate Global to provide site offices and welfare facilities on a new build construction site at 22 Bishopsgate in London, Multiplex reached out to Westgate Global again to provide Hoardfast, a quality temporary…

John Paul Construction are leading international specialists in construction, infrastructure, fit-out and asset management. They were undertaking a student accommodation project in Aungier Street, Dublin 2, and needed to provide internal welfare…

Dust containment was a major consideration on this project due to there being a number of surrounding shops, live cafe area on the third floor and continued access to the general public, so Marshall (Building Contractors) Ltd needed a full enclosure including a ceiling that would stop any dust contamination throughout the rest of the building.

Flexibility was key and ScS requested a solution that allowed the sides of the partition to be rolled up. In the short term this feature could provide access for any large equipment or in this case, furniture to move in and out of the area to be photographed.

Internal freestanding hoarding was required during a project to restore the Cathedral’s organ. The organ and its pipe work needed to be dismantled and removed, whilst the Cathedral remained open for visitors.

Approximately 160 workers would be using these facilities, so they needed to be robust, yet clean and professional in appearance.

Temporary internal site rooms were created using Hoardfast uPVC panels for their quality and freestanding nature.

For this project Flexiwall was recommended, designed and installed as it is durable enough for permanent applications yet can be easily reconfigured.