Providing essential office and welfare spaces for John Sisk & Son Ltd contractors on site
Temporary internal site rooms were created using Hoardfast uPVC panels for their quality and freestanding nature.

Temporary internal site rooms were created using Hoardfast uPVC panels for their quality and freestanding nature.

Westgate Global were required to help deliver the design, supply and installation of a temporary corridor on two levels, which would link a new pier to the existing terminal whilst the terminal extension was still being fitted out.

For this project Flexiwall was recommended, designed and installed as it is durable enough for permanent applications yet can be easily reconfigured.

PD Ports approached various companies to find their solution and ultimately chose Westgate Global because of our competitive pricing, the superior quality of our product and our extensive experience in installing fabric partitioning solutions.

The DHL team at Daventry International Rail Freight Terminal (DIRFT) contacted Westgate Global for a partitioning solution to segregate storage of food and drink containers from non-food products.

From the start it was clear a full-height solid wall carried a number of complexities, including installation around the existing and multiple penetrations at high level.

Hoardfast Firescreen and uPVC were used to create both a cutting room and site offices.

Operating in the food and drink industry means that Kingsland Drinks must meet the requirements for BRC accreditation. Flexiwall helps with this as it is manufactured from food safe materials, delivers an over 99% dust tight seal and easily segregates production and storage areas.

Vision Express is one of the largest optical retailers in the UK and part of GrandVision, the global leader in optical retail operating in more than 40 countries. With almost 600 stores nationwide, Vision Express first opened its doors in Newcastle…

Westgate Global were approached to provide internal site hoarding to shield the ongoing renovations from customers as the airport remained fully open whilst the project was underway.