
Site offices and welfare spaces in new build skyscraper
Westgate Global provided Hoardfast uPVC to create: 40 toilet cubicles, 3 shower cubicles, a separate room to house urinals, sinks and hand dryers.

Westgate Global provided Hoardfast uPVC to create: 40 toilet cubicles, 3 shower cubicles, a separate room to house urinals, sinks and hand dryers.

In the dynamic and challenging environment of construction, providing proper welfare facilities is not just a legal requirement; it’s a vital component in ensuring the health, safety, and wellbeing of workers.

Dust screening for construction work is often a necessity within manufacturing environments, needed to safely enable machinery upgrades or replacements, extend buildings or improve efficiencies in line with any industry or technological developments.

In the dynamic and challenging environment of construction, providing proper welfare facilities is not just a legal requirement; it’s a vital component in ensuring the health, safety, and wellbeing of workers.

Flexiscreen was the ideal choice due to its competitive pricing and the ability to relocate as needed. This versatile solution also exceeded expectations, providing additional sound reduction properties.

Hoardfast Firescreen was chosen for external weathering walls, site rooms and welfare facilities for workers during a redevelopment.

Having worked with Westgate Global previously, a global pharmaceutical company (and their engineering consultants) knew they could rely on Westgate Global to divide this particular facility during a construction project and support on contamination…

Having previously worked with Westgate Global to provide site offices and welfare facilities on a new build construction site at 22 Bishopsgate in London, Multiplex reached out to Westgate Global again to provide Hoardfast, a quality temporary…

Dust containment was a major consideration on this project due to there being a number of surrounding shops, live cafe area on the third floor and continued access to the general public, so Marshall (Building Contractors) Ltd needed a full enclosure including a ceiling that would stop any dust contamination throughout the rest of the building.

Westgate Global were required to help deliver the design, supply and installation of a temporary corridor on two levels, which would link a new pier to the existing terminal whilst the terminal extension was still being fitted out.