
Flexiwall used to segregate logistics from inspection areas for Jaguar Land Rover
For this project Flexiwall was recommended, designed and installed as it is durable enough for permanent applications yet can be easily reconfigured.

For this project Flexiwall was recommended, designed and installed as it is durable enough for permanent applications yet can be easily reconfigured.

Discover how Westgate Global helped Multimatic create a custom storage area at their Coventry facility using Flexiwall partitions. This bespoke solution offers flexibility, minimal floor space use, and easy reconfiguration for future needs, while incorporating branding and a roller shutter door for access.

Due to the strong relationship with Birds Eye, Westgate Global were asked to facilitate a solution. Flexiscreen was recommended for a number of reasons, with the first of those being specific to this project: Flexiscreen can be easily installed at an angle, which is a very big advantage over conventional temporary screening methods.

Multimatic required Westgate Global to install an additional Flexiwall with the purpose of extending a previous Flexiwall installation from 6 years ago.

Westgate Global installed Flexiwall as an ideal solution for meeting BRC hygiene standards, having a dust tight seal and a unique v-overlap made it the perfect product to use for this project.

“The ability to keep production moving whilst important construction works are in progress is paramount… with Flexiscreen, Westgate Global ensured we could achieve this.”

A vehicle manufacturing plant approached Westgate Global with regards to relocating an existing large section of grey Flexiwall partitioning installed by Westgate Global approximately 15 years ago. The partition had previously seen a number of other…

Westgate Global’s Hoardfast uPVC modular partitioning system was used, as it features a click together joint that is quick to install, and does not create any dust or mess.

Westgate Global was called in by NFT Distribution to create a partition in a new build chilled warehouse at Tilbury Docks. This requirement had been driven by a new contract that required part of the existing warehouse to operate at a colder temperature.