Safe, relocatable site offices and welfare facilities in the heart of London

For this major central London development, Multiplex needed to bring its site offices and welfare facilities inside the building at Marble Arch Place. The structure was still an open concrete frame and the surrounding streets were some of the busiest in London.

Westgate Global’s Hoardfast system was used to create internal site rooms, complete with a canteen, offices, meeting rooms and a prayer room. The accommodation was safe, comfortable and ready to move as the project evolved.

Multiplex_(company)_logo

Internal site rooms for landmark London development

In 2021, global construction company Multiplex was appointed main contractor for the high-profile redevelopment of Marble Arch Place. Located on the corner of Oxford Street, with panoramic views over Hyde Park and the West End, the two adjacent buildings form an impressive mixed-use scheme and landmark development.

6 Marble Arch rises eighteen storeys above ground and an extraordinary five below, offering over 12,500 sq ft of self-contained office space, 58,000 sq ft of retail and leisure space, and 54 exquisite apartments. 5 Marble Arch provides 83,000 sq ft of best-in-class office space across seven floors, with three outdoor terraces. The scale of the project, along with Multiplex’s position as an industry leader in workers’ rights and welfare, made welfare facilities an important consideration.

Bringing welfare facilities on site

During the early phases of the project, Multiplex used off-site offices and welfare facilities. As work progressed, the company decided to move these facilities into the building itself. As well as giving the site team excellent working conditions and high-quality facilities, bringing site offices and welfare facilities closer to the work would help maximise productivity, saving time throughout the day.

The location also made internal site rooms the most practical option. Marble Arch is one of the busiest parts of central London, with heavy traffic and constant footfall from shoppers, tourists and commuters. Space around the site was extremely limited, leaving little room for traditional cabins or modular welfare units. Building offices and welfare facilities inside the structure kept the site footprint as small as possible and reduced disruption to the surrounding area. 

The solution was needed during the slab-to-slab construction phase. Before the permanent façade was installed, Multiplex needed temporary enclosure panels between floors that offered one-hour fire protection and kept the on-site offices and welfare facilities insulated and weatherproof.

A complete site accommodation area

Having worked with Westgate Global to provide site offices and welfare facilities at 22 Bishopsgate in London, Multiplex turned to Westgate Global again for Hoardfast®, its modular temporary internal hoarding system. Westgate Global supplied 220 linear metres of Hoardfast Firescreen and 30 linear metres of Hoardfast PVC. Together, the two systems formed a complete internal site accommodation area, including a canteen and break area, separate male and female toilets, offices, meeting rooms and a prayer room.

Hoardfast Firescreen is made from white steel-faced composite panels with a mineral wool core. The 60-minute (EI60) version used on this project is certified to EN 13501-1 A2-s1-d0, giving Multiplex the fire performance it needed. The mineral wool core also provides thermal insulation and reduces noise, creating a comfortable working environment away from the surrounding construction activity. Hoardfast PVC panels were used alongside it. They are lightweight but strong and impact-resistant, with a clean, smart finish that suits offices and meeting spaces.

Welfare facilities support CDM compliance

The site rooms also helped Multiplex meet its duties under the Construction (Design and Management) Regulations 2015. CDM requires suitable welfare facilities from the start of a project, including toilets, washing facilities, drinking water, changing areas and rest areas where workers can eat and make hot drinks, all adequately ventilated, lit and kept at a reasonable temperature.

Hoardfast allowed these rooms to be built inside the building, close to where people were working, with insulated Firescreen panels keeping them warm and protected from the weather. CDM also requires contractors to take suitable steps to prevent injury from fire, and using 60-minute fire-rated panels for occupied rooms helps protect the people inside and gives them time to escape if a fire breaks out elsewhere on site.

Flexibility was another deciding factor, as the site rooms needed to move with the project. Both systems use a modular tongue-and-groove, push-fit connection, so panels can be installed quickly, then taken down, relocated and reconfigured to suit later project phases. A range of accessories meant doors and windows could be built into the installation, and the system could be tailored to the project’s specific requirements.

Hoardfast also supported Multiplex’s commitment to minimising on-site waste and reducing the project’s environmental impact. Because the panels could be moved and reused as the project progressed, less material was needed overall. Westgate Global also worked with Multiplex so that, at the end of the project, the panels could be demounted and returned to Westgate Global for recycling.

Hoardfast gave Multiplex a safe, comfortable and flexible way to bring its site offices and welfare facilities inside Marble Arch Place, proving that even on the busiest and most constrained central London sites, high-quality welfare doesn’t have to be compromised.

"Hoardfast gave Multiplex a safe, comfortable and flexible way to bring its site offices and welfare facilities inside Marble Arch Place, proving that even on the busiest and most constrained central London sites, high-quality welfare doesn't have to be compromised. The fire-rated, insulated site accommodation kept the team close to the work, supported CDM compliance and adapted with every phase of the project."
Westgate Global

Got a project coming up?

We’re here to transform your screening, partitioning, hoarding, and protection challenges into effective and compliant solutions. Whether you have a known requirement, need expert advice or a full scale project scoped and delivered, we’re here to help protect your momentum.