Major airport façade works facilitated by bespoke hoarding solution
Bristol Airport is undergoing a £400 million terminal transformation designed to increase passenger capacity to 12 million travellers annually. As part of the project, Farrans Construction was appointed to deliver a two-floor terminal extension. The project will infill the area between the existing terminal building and the departure gates, increasing the terminal’s footprint by 45% and adding 17 shops and restaurants. Additional space for island retail units and more seating, a new domestic arrivals reclaim area, new lifts and stairs will also enhance the passenger experience and support the airport’s long-term growth.
As England’s third-largest regional airport and the international gateway for the South West of England and South Wales, it is vital that the airport remains open to passengers and that the passenger experience is not impacted while the work takes place. The project also required wind and weather protection during the removal of the existing façade. As the existing lightweight sheet-metal roofing provided insufficient strength and rigidity for conventional floor-to-ceiling hoarding fixings, Farran’s Construction needed a partner capable of developing a bespoke solution.
Having worked with Westgate Global on the £100m Leeds Bradford Airport (LBA) regeneration project, Farrans Construction approached the team to provide a solution for the demanding technical, operational and aesthetic requirements of the live airport environment. Westgate Global’s in-house team undertook a full survey, providing structural calculations and detailed engineering submissions as part of the project proposal, with dedicated, collaborative project management maintained throughout delivery.

To meet the project’s unique engineering requirements, the team designed and fabricated a bespoke solution to overcome the structural limitations of the lightweight roof interface. Traditional floor-to-ceiling fixings could not be used, so the team designed and installed a framework using box-section steelwork. The framework was then clad with Hoardfast® Firescreen with a 60 minute fire-rating, ensuring compliance with the airport’s fire strategy while creating a robust enclosure capable of withstanding the exposed environmental conditions. The temporary hoarding solution provided weather protection, maintained security and safely separated construction activities from the public.