Neilcott Construction Ltd London

Modular fire-rated and acoustic hoarding for Neilcott Construction at Kingston University

Customer

Neilcott Construction

Sector

Fit out and refurbishment

Location

London

Keeping campus life running during a multi-phase renovation

Renovating a working university campus means construction and daily life happening side by side. Lectures must continue, students need to move through the building, and staff must continue their work, all within metres of an active construction zone.

Neilcott Construction Ltd appointed Westgate Global to deliver a fire-rated, acoustically effective screening solution that was modular enough to be repositioned quickly as the renovation progressed through the building.

logo-neilcott-ROS-pages

Busy university campus, and a complex refurbishment programme

Westgate Global partnered with Neilcott Construction Ltd to provide an effective solution for managing fire safety, noise, and dust control during a multi-phase renovation project at Kingston University. The project required a modular system that could be easily relocated as different phases of construction progressed, ensuring minimal disruption to students, staff, and the public.

The university remained operational throughout the renovation, making it essential to implement robust fire and sound protection to maintain a safe and productive environment. A significant amount of dust was generated from the ongoing construction activities, which required an efficient containment solution. As the project was executed in multiple phases, temporary barriers needed to be modular and easily repositioned as work progressed.

Westgate Global supplied two solutions from our Hoardfast range to Neilcott Construction Ltd. Hoardfast Firescreen provided critical fire-rated panels, ensuring compliance with safety regulations and offering peace of mind to all university occupants. Hoardfast Soundscreen effectively minimised noise pollution from construction work, helping to maintain a suitable academic environment. Both solutions helped contain dust and debris, ensuring cleanliness and safety across the university premises. The lightweight, modular nature of Hoardfast enabled quick reconfiguration as the renovation progressed through different phases, reducing downtime and labour costs.

A modular hoarding system built for every phase

Double and single internal fire doors were also installed as part of the project. The fire doors are flush-faced with 8mm hardwood lipping at the vertical edge. Stringently tested and certified, Westgate Global fire doors meet full compliance for their designated environment.

The installation of Hoardfast Firescreen enhanced safety by meeting fire safety regulations and safeguarding students, staff, and visitors. Hoardfast Soundscreen significantly reduced noise disruptions, maintaining a conducive learning and working environment. The nature of the system allowed seamless adaptation to each phase of the project, keeping the renovation on schedule and within budget.

By leveraging Westgate Global’s Hoardfast Firescreen and Soundscreen solutions, Neilcott Construction Ltd successfully delivered a safe, efficient, and minimally disruptive renovation at Kingston University. The project highlights the importance of adaptable, high-performance partitioning systems in complex construction environments.

 

Learn more about Hoardfast

"It is vital when renovating a working university campus, that disruption to staff, students and visitors is kept to a minimum. Our Hoardfast panel system – a fire rated, sound reducing and dust containing solution, ensured the safety of all and progressed the refurbishment works programme."
Ben Rooke Account Manager, Westgate Global

Got a project coming up?