Terex Equipment keep finished products clean with a factory partition wall Flexiwall
Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Dust containment was a major consideration on this project due to there being a number of surrounding shops, live cafe area on the third floor and continued access to the general public, so Marshall (Building Contractors) Ltd needed a full enclosure including a ceiling that would stop any dust contamination throughout the rest of the building.

Westgate Global were invited to install Flexiscreen to assist Kerry whilst installing a new production line without disrupting current manufacturing.

Due to the strong relationship with Birds Eye, Westgate Global were asked to facilitate a solution. Flexiscreen was recommended for a number of reasons, with the first of those being specific to this project: Flexiscreen can be easily installed at an angle, which is a very big advantage over conventional temporary screening methods.

From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

Westgate Global installed Flexiwall as an ideal solution for meeting BRC hygiene standards, having a dust tight seal and a unique v-overlap made it the perfect product to use for this project.

We provided a partition solution to divide off a large redundant area within their open plan manufacturing plant. This would reduce the energy usage for heating and lighting and have a positive impact on their carbon footprint.

Morgan Sindall had been contracted by Heathrow Airport Ltd and British Airways to modernise hangars at the West London airport in preparation for the arrival of the new airbus. This will allow greater flexibility of working space during maintenance…

“The ability to keep production moving whilst important construction works are in progress is paramount… with Flexiscreen, Westgate Global ensured we could achieve this.”

Westgate Global were tasked with providing a partition that would deliver both temperature and odour control for Great Bear’s warehouse storage facility.