Hoardfence external site refurbishment hoarding – MTG Building Services
Hoardfence external hoarding was used during a refurbishment project, due to it’s rapid installation time and professional finish.

Hoardfence external hoarding was used during a refurbishment project, due to it’s rapid installation time and professional finish.

Hoardfast Firescreen was chosen for external weathering walls, site rooms and welfare facilities for workers during a redevelopment.

Westgate Global have worked with Mace, known as global experts in shaping the built environment, on numerous occasions, and with an excellent track record, we were consulted again.

Having previously worked with Westgate Global to provide site offices and welfare facilities on a new build construction site at 22 Bishopsgate in London, Multiplex reached out to Westgate Global again to provide Hoardfast, a quality temporary…

Internal freestanding hoarding was required during a project to restore the Cathedral’s organ. The organ and its pipe work needed to be dismantled and removed, whilst the Cathedral remained open for visitors.

Westgate Global were required to help deliver the design, supply and installation of a temporary corridor on two levels, which would link a new pier to the existing terminal whilst the terminal extension was still being fitted out.

Hoardfast Firescreen and uPVC were used to create both a cutting room and site offices.

Aperture Group required a solution to achieve segregation between production and storage areas for dust prevention and temperature control. Wind loads also needed to be taken into account as the partition was being installed beside external shutter…

Uniroyal Global installed a Flexiwall partition to maintain temperature and humidity levels for their vehicle seat manufacturing. This energy-efficient solution provided insulation, easy reconfiguration, and ensured optimal conditions without heating the entire factory.

Learn how Westgate Global helped Allied Glass meet fire safety and temperature control requirements with a custom fire-rated Flexiwall partition. This solution ensured compliance with British Safety Standards while providing flexibility for future changes in their manufacturing environment.