
Factory noise reduction with Flexiwall partitioning
Flexiwall fabric partition was installed to help minimise the sound within the work area. Westgate Global were able to reduce the decibels in this area by 21.9db.

Flexiwall fabric partition was installed to help minimise the sound within the work area. Westgate Global were able to reduce the decibels in this area by 21.9db.

The successful collaboration between Westgate Global and ISG enabled DB Schenker to create a temperature-controlled area within their new warehouse facility. The installation of Flexiwall and mesh Anchorwall provided DB Schenker with a flexible…

Loop Technology recognised the need for a controlled environment to support their Advanced Automated Preforming Technology (AdAPT) composite preforming demonstration cell. To address the challenge of containing composite fibres and preventing them…

Wienerberger, the leading global manufacturer of bricks, clay blocks and clay roof tiles, wanted to address a health and safety challenge at their Dosthill factory. Although the dust levels within the clay production area are below the legal limits…

Westgate Global were tasked with providing safe and secure perimeter hoarding for a science and technology campus undergoing construction work.

Hoardfence external hoarding was used during a refurbishment project, due to it’s rapid installation time and professional finish.

Having worked with Westgate Global previously, a global pharmaceutical company (and their engineering consultants) knew they could rely on Westgate Global to divide this particular facility during a construction project and support on contamination…

Product packaging manufacturer Sealed Air, known for brands such as Bubble Wrap and Cryovac, were looking to segregate a dusty process area and a clean room within their St. Neots facility.

Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Dust containment was a major consideration on this project due to there being a number of surrounding shops, live cafe area on the third floor and continued access to the general public, so Marshall (Building Contractors) Ltd needed a full enclosure including a ceiling that would stop any dust contamination throughout the rest of the building.