
Providing essential office and welfare spaces for John Sisk & Son Ltd contractors on site
Temporary internal site rooms were created using Hoardfast uPVC panels for their quality and freestanding nature.

Temporary internal site rooms were created using Hoardfast uPVC panels for their quality and freestanding nature.

PD Ports approached various companies to find their solution and ultimately chose Westgate Global because of our competitive pricing, the superior quality of our product and our extensive experience in installing fabric partitioning solutions.

The DHL team at Daventry International Rail Freight Terminal (DIRFT) contacted Westgate Global for a partitioning solution to segregate storage of food and drink containers from non-food products.

From the start it was clear a full-height solid wall carried a number of complexities, including installation around the existing and multiple penetrations at high level.

Hoardfast Firescreen and uPVC were used to create both a cutting room and site offices.

Learn how a global logistics distribution center improved pedestrian safety by installing crash barriers from Westgate Global, effectively segregating vehicle and foot traffic to minimize risks and enhance workplace safety.

Vision Express is one of the largest optical retailers in the UK and part of GrandVision, the global leader in optical retail operating in more than 40 countries. With almost 600 stores nationwide, Vision Express first opened its doors in Newcastle…

Westgate Global helped Hydram Engineering create a dust-tight, flexible partition with Flexiwall in their 115,000 sq ft facility. The solution provided a custom three-sided enclosure to support specialist manufacturing, with minimal floor space usage and easy reconfiguration.

Discover how Westgate Global helped EGGER create a controlled clean room within their warehouse using Flexiwall partitions. Learn about the fast installation process, custom design, and the benefits of a flexible, relocatable solution for EGGER’s growing needs.

Flexiwall needed to be installed between the main bottling plant and various storage areas, effectively acting as a barrier to prevent airborne dust from migrating and settling on the bottling lines. This not only complied with their H&S mandates but also improved on food and drink hygiene.