
Factory noise reduction with Flexiwall partitioning
Flexiwall fabric partition was installed to help minimise the sound within the work area. Westgate Global were able to reduce the decibels in this area by 21.9db.

Flexiwall fabric partition was installed to help minimise the sound within the work area. Westgate Global were able to reduce the decibels in this area by 21.9db.

Loop Technology recognised the need for a controlled environment to support their Advanced Automated Preforming Technology (AdAPT) composite preforming demonstration cell. To address the challenge of containing composite fibres and preventing them…

Wienerberger, the leading global manufacturer of bricks, clay blocks and clay roof tiles, wanted to address a health and safety challenge at their Dosthill factory. Although the dust levels within the clay production area are below the legal limits…

Hoardfast Firescreen was chosen for external weathering walls, site rooms and welfare facilities for workers during a redevelopment.

Product packaging manufacturer Sealed Air, known for brands such as Bubble Wrap and Cryovac, were looking to segregate a dusty process area and a clean room within their St. Neots facility.

Having worked with Westgate Global before, knowledge of our Hoardfast product quality, short lead time and excellent service, secured Westgate Global becoming the supplier of choice. Hoardfast Firescreen was used on the project to deliver the quick…

Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Dust containment was a major consideration on this project due to there being a number of surrounding shops, live cafe area on the third floor and continued access to the general public, so Marshall (Building Contractors) Ltd needed a full enclosure including a ceiling that would stop any dust contamination throughout the rest of the building.

Internal freestanding hoarding was required during a project to restore the Cathedral’s organ. The organ and its pipe work needed to be dismantled and removed, whilst the Cathedral remained open for visitors.

From the start it was clear a full-height solid wall carried a number of complexities, including installation around the existing and multiple penetrations at high level.