
Exwold Technology’s production area contamination control project
Flexiwall was the ideal solution, not only providing a physical barrier to prevent cross contamination, it is also far quicker and cleaner to install than a traditional partition.

Flexiwall was the ideal solution, not only providing a physical barrier to prevent cross contamination, it is also far quicker and cleaner to install than a traditional partition.

Westgate Global have worked with Mace, known as global experts in shaping the built environment, on numerous occasions, and with an excellent track record, we were consulted again.

BW are a fit out and refurbishment company who work with occupiers, asset managers and consultants to deliver workplaces with a personal touch. BW were working on a London fit out project in a 6 storey office development at 1 Finsbury Avenue…

Having previously worked with Westgate Global to provide site offices and welfare facilities on a new build construction site at 22 Bishopsgate in London, Multiplex reached out to Westgate Global again to provide Hoardfast, a quality temporary…

From the start it was clear a full-height solid wall carried a number of complexities, including installation around the existing and multiple penetrations at high level.

Aperture Group required a solution to achieve segregation between production and storage areas for dust prevention and temperature control. Wind loads also needed to be taken into account as the partition was being installed beside external shutter…

Uniroyal Global installed a Flexiwall partition to maintain temperature and humidity levels for their vehicle seat manufacturing. This energy-efficient solution provided insulation, easy reconfiguration, and ensured optimal conditions without heating the entire factory.

Learn how Westgate Global helped Allied Glass meet fire safety and temperature control requirements with a custom fire-rated Flexiwall partition. This solution ensured compliance with British Safety Standards while providing flexibility for future changes in their manufacturing environment.

From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

Westgate Global helped Hydram Engineering create a dust-tight, flexible partition with Flexiwall in their 115,000 sq ft facility. The solution provided a custom three-sided enclosure to support specialist manufacturing, with minimal floor space usage and easy reconfiguration.