Exwold Technology’s production area contamination control project
Flexiwall was the ideal solution, not only providing a physical barrier to prevent cross contamination, it is also far quicker and cleaner to install than a traditional partition.

Flexiwall was the ideal solution, not only providing a physical barrier to prevent cross contamination, it is also far quicker and cleaner to install than a traditional partition.

Westgate Global were required to help deliver the design, supply and installation of a temporary corridor on two levels, which would link a new pier to the existing terminal whilst the terminal extension was still being fitted out.

For this project Flexiwall was recommended, designed and installed as it is durable enough for permanent applications yet can be easily reconfigured.

Discover how Westgate Global helped Multimatic create a custom storage area at their Coventry facility using Flexiwall partitions. This bespoke solution offers flexibility, minimal floor space use, and easy reconfiguration for future needs, while incorporating branding and a roller shutter door for access.

Multimatic required Westgate Global to install an additional Flexiwall with the purpose of extending a previous Flexiwall installation from 6 years ago.

Westgate Global were approached to provide internal site hoarding to shield the ongoing renovations from customers as the airport remained fully open whilst the project was underway.

Morgan Sindall had been contracted by Heathrow Airport Ltd and British Airways to modernise hangars at the West London airport in preparation for the arrival of the new airbus. This will allow greater flexibility of working space during maintenance…

A vehicle manufacturing plant approached Westgate Global with regards to relocating an existing large section of grey Flexiwall partitioning installed by Westgate Global approximately 15 years ago. The partition had previously seen a number of other…