Floor-to-ceiling protection, built around a live operation.
Westgate Global specified Flexiscreen as the primary separation system. With just two skilled installers and a Mobile Elevating Work Platform required for installation, it was installed cleanly and quickly without the heavy plant or prolonged preparation time that alternative solutions would have required.
Flexiscreen’s v-overlap system delivers a 99%+ dust-tight seal and can be fitted neatly around high-level services. Despite being installed at the facility’s full 14-metre height, there was no need for additional mid-span support structure, which meant that the working area around the new freezer installation clear and accessible.
A fire escape access door was built directly into the Flexiscreen, fitted with a digilock for CDM compliance and a fire escape push pad. With a tensile strength of 3 tonnes per linear metre, the system absorbs impact and keeps maintenance requirements low. As a one-off purchase, the client avoided the ongoing rental costs and periodic safety checks that alternative temporary solutions would have required.
Given the sensitivity of the site, Westgate Global also installed a 3-metre free-standing Hoardfast modular PVC partition in front of the Flexiscreen as a secondary line of defence, creating an additional physical barrier to provide maximum protection against contamination and unplanned access.
With on-site surveying not possible during the pandemic, the entire solution was designed and manufactured remotely using 3D drawings supplied by the client. Installation was complete four weeks from order.
Compliant, award-winning installation
From first installation to final sign-off, the facility remained clean, compliant, and fully operational. The engineering consultancy managing the project recognised Westgate Global’s safe working with their SafeContractor of the Month award, on a site where standards are exceptionally high.
Learn more about Flexiscreen
Learn more about Hoardfast PVC