Resource Hub

Projects

Seamless food production during construction at Charlie Bigham’s

Westgate Global designed and installed a bespoke Flexiscreen segregation system at Charlie Bigham’s Somerset facility, maintaining food-safe standards during live construction works. The translucent screen ensured light flow, achieved 99% dust control, and allowed uninterrupted production despite challenging site conditions and strict hygiene regulations.

Learn more »
Projects

Reliable temporary aisle emulation for heat load testing for leading Data Centre partner

Westgate Global provided a trusted data centre partner with a durable and reusable temporary aisle emulation system for heat load testing. Designed to prevent collapses and reduce maintenance time, this pre-manufactured solution ensures reliable testing. Easy to install and relocate, it was successfully transported from Germany to Spain, offering consistent performance across multiple sites.

Learn more »
Projects

Custom temporary hot aisle containment panels for Winthrop Technologies

Westgate Global partnered with Winthrop Technologies to deliver a bespoke temporary hot aisle containment (HAC) solution for data centre commissioning. Using reinforced PVC panels, Westgate’s system accelerated commissioning timelines, ensured precise airflow control, and protected whitespace from damage. Reusable across multiple projects, this innovative solution reduces waste and enhances efficiency in heat load testing.

Learn more »