-
Company: Multinational FMCG Company
-
Location: Gloucester
-
Overview: Live production contamination control during groundworks
-
Solution: Flexiscreen
A multinational FMCG giant were undertaking groundwork alongside a live ice cream line. A solution was needed to keep production moving, ensuring the safety and integrity of their products as the works took place.
Flexiscreen proved to be the perfect choice for the company’s requirements. With Flexiscreen, there’s minimal downtime, and maximum protection. This innovative screen was designed to be quick and clean to install, providing a 99% dust-tight seal once in place.
By effectively sealing off the groundworks area, Flexiscreen significantly minimised the disruption to production schedules and reduced the risk of contamination. The dust-tight seal prevents the entry of particulates, debris, or contaminants into the production area. This enhances overall hygiene and safety standards and aids meeting stringent quality control requirements.