Amcor create a temperature controlled area for curing process
From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

Westgate Global installed Flexiwall as an ideal solution for meeting BRC hygiene standards, having a dust tight seal and a unique v-overlap made it the perfect product to use for this project.

Westgate Global helped Hydram Engineering create a dust-tight, flexible partition with Flexiwall in their 115,000 sq ft facility. The solution provided a custom three-sided enclosure to support specialist manufacturing, with minimal floor space usage and easy reconfiguration.

Explore how Westgate Global helped Halcion Express improve warehouse efficiency with a Flexiwall partition. This cost-effective, floor-to-ceiling solution segregated the loading bay, controlled dust and temperature, and supported future BRC certification. The solution also included crash barriers and access points for seamless operation.

Discover how Westgate Global helped EGGER create a controlled clean room within their warehouse using Flexiwall partitions. Learn about the fast installation process, custom design, and the benefits of a flexible, relocatable solution for EGGER’s growing needs.

Flexiwall needed to be installed between the main bottling plant and various storage areas, effectively acting as a barrier to prevent airborne dust from migrating and settling on the bottling lines. This not only complied with their H&S mandates but also improved on food and drink hygiene.

“The Flexiwall installation was a thing of beauty, completed ahead of schedule with no fuss. It has made a massive difference to the working area conditions.”

Over twenty years ago, Egbert Taylor Group (the leading designer and manufacturer of recycling containers, aesthetic street furniture and galvanized steel containers for recycling and waste), called on Westgate Global to install an 80m long by 6m high partition wall in their UK warehouse. Recently they contacted Westgate Global again to relocate it.

Allport wanted to ensure that it was impossible for dust to get onto the items that they were holding in storage for their new client. Having already had a similar partition installation five years earlier, Allport re-engaged with Westgate, knowing they could trust the product to fulfil the requirements of the job and receive the usual excellent service provided by Westgate’s experienced team.

Westgate Global were tasked with providing a partition that would deliver both temperature and odour control for Great Bear’s warehouse storage facility.