
External weathering and employee spaces to enable works to continue for Wates
Hoardfast Firescreen was chosen for external weathering walls, site rooms and welfare facilities for workers during a redevelopment.

Hoardfast Firescreen was chosen for external weathering walls, site rooms and welfare facilities for workers during a redevelopment.

Office design and fit out experts Morgan Lovell required temporary internal hoarding for a project at 20 Canada Square, Canary Wharf, London.

Artemis Interiors looked to Westgate Global to supply and install Hoardfast to create a site office, meeting room and canteen area.

BW are a fit out and refurbishment company who work with occupiers, asset managers and consultants to deliver workplaces with a personal touch. BW were working on a London fit out project in a 6 storey office development at 1 Finsbury Avenue…

John Paul Construction are leading international specialists in construction, infrastructure, fit-out and asset management. They were undertaking a student accommodation project in Aungier Street, Dublin 2, and needed to provide internal welfare…

Approximately 160 workers would be using these facilities, so they needed to be robust, yet clean and professional in appearance.

Temporary internal site rooms were created using Hoardfast uPVC panels for their quality and freestanding nature.

Hoardfast Firescreen and uPVC were used to create both a cutting room and site offices.

Aperture Group required a solution to achieve segregation between production and storage areas for dust prevention and temperature control. Wind loads also needed to be taken into account as the partition was being installed beside external shutter…

Uniroyal Global installed a Flexiwall partition to maintain temperature and humidity levels for their vehicle seat manufacturing. This energy-efficient solution provided insulation, easy reconfiguration, and ensured optimal conditions without heating the entire factory.