
Amcor create a temperature controlled area for curing process
From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

Flexiwall needed to be installed between the main bottling plant and various storage areas, effectively acting as a barrier to prevent airborne dust from migrating and settling on the bottling lines. This not only complied with their H&S mandates but also improved on food and drink hygiene.

Westgate Global provided and installed a 10m x 10m external Flexiwall which was hung from the existing canopy roof structure. A Fastflex fast action door and a steel pedestrian door were also supplied and installed by Westgate Global.

Westgate Global was called in by NFT Distribution to create a partition in a new build chilled warehouse at Tilbury Docks. This requirement had been driven by a new contract that required part of the existing warehouse to operate at a colder temperature.

Westgate Global consulted with Marshalls and designed a Flexiwall solution that would partition current production and curing areas without the need for redevelopment.