Safe and secure perimeter hoarding for Harmony Building Ltd construction works
Westgate Global were tasked with providing safe and secure perimeter hoarding for a science and technology campus undergoing construction work.

Westgate Global were tasked with providing safe and secure perimeter hoarding for a science and technology campus undergoing construction work.

Hoardfast Firescreen was chosen for external weathering walls, site rooms and welfare facilities for workers during a redevelopment.

Westgate Global have worked with Mace, known as global experts in shaping the built environment, on numerous occasions, and with an excellent track record, we were consulted again.

BW are a fit out and refurbishment company who work with occupiers, asset managers and consultants to deliver workplaces with a personal touch. BW were working on a London fit out project in a 6 storey office development at 1 Finsbury Avenue…

Having previously worked with Westgate Global to provide site offices and welfare facilities on a new build construction site at 22 Bishopsgate in London, Multiplex reached out to Westgate Global again to provide Hoardfast, a quality temporary…

Aperture Group required a solution to achieve segregation between production and storage areas for dust prevention and temperature control. Wind loads also needed to be taken into account as the partition was being installed beside external shutter…

Uniroyal Global installed a Flexiwall partition to maintain temperature and humidity levels for their vehicle seat manufacturing. This energy-efficient solution provided insulation, easy reconfiguration, and ensured optimal conditions without heating the entire factory.

Learn how Westgate Global helped Allied Glass meet fire safety and temperature control requirements with a custom fire-rated Flexiwall partition. This solution ensured compliance with British Safety Standards while providing flexibility for future changes in their manufacturing environment.

From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

Flexiwall needed to be installed between the main bottling plant and various storage areas, effectively acting as a barrier to prevent airborne dust from migrating and settling on the bottling lines. This not only complied with their H&S mandates but also improved on food and drink hygiene.