
4 effective ways to control dust in your facility
Dust is a common occurrence in factories and warehouses due to the movement of products, vehicles, personnel, boxes and due to the myriad of processes.

Dust is a common occurrence in factories and warehouses due to the movement of products, vehicles, personnel, boxes and due to the myriad of processes.

DB Schenker, a leading logistics and transportation company, sought to optimise their warehouse operations by dividing their existing space into two distinct areas due to new contracts awarded. The primary objectives were to address concerns related…

Transforming Sky Studios: OD Interiors implements Flexiwall partition for segregation and dust control of props storage. Having previously worked with Westgate Global, OD Interiors chose to collaborate with them again for the Sky Studios project…

Hoardfast Firescreen was chosen for external weathering walls, site rooms and welfare facilities for workers during a redevelopment.

Office design and fit out experts Morgan Lovell required temporary internal hoarding for a project at 20 Canada Square, Canary Wharf, London.

Artemis Interiors looked to Westgate Global to supply and install Hoardfast to create a site office, meeting room and canteen area.

BW are a fit out and refurbishment company who work with occupiers, asset managers and consultants to deliver workplaces with a personal touch. BW were working on a London fit out project in a 6 storey office development at 1 Finsbury Avenue…

Having previously worked with Westgate Global to provide site offices and welfare facilities on a new build construction site at 22 Bishopsgate in London, Multiplex reached out to Westgate Global again to provide Hoardfast, a quality temporary…

John Paul Construction are leading international specialists in construction, infrastructure, fit-out and asset management. They were undertaking a student accommodation project in Aungier Street, Dublin 2, and needed to provide internal welfare…

Dust containment was a major consideration on this project due to there being a number of surrounding shops, live cafe area on the third floor and continued access to the general public, so Marshall (Building Contractors) Ltd needed a full enclosure including a ceiling that would stop any dust contamination throughout the rest of the building.