
Projects
Hoardfence external site refurbishment hoarding – MTG Building Services
Hoardfence external hoarding was used during a refurbishment project, due to it’s rapid installation time and professional finish.

Hoardfence external hoarding was used during a refurbishment project, due to it’s rapid installation time and professional finish.

Westgate Global were tasked with providing a partition that would deliver both temperature and odour control for Great Bear’s warehouse storage facility.

Westgate Global provided and installed a 10m x 10m external Flexiwall which was hung from the existing canopy roof structure. A Fastflex fast action door and a steel pedestrian door were also supplied and installed by Westgate Global.

Westgate Global consulted with Marshalls and designed a Flexiwall solution that would partition current production and curing areas without the need for redevelopment.