
Projects
Amcor create a temperature controlled area for curing process
From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

Westgate Global were tasked with providing a partition that would deliver both temperature and odour control for Great Bear’s warehouse storage facility.

Westgate Global provided and installed a 10m x 10m external Flexiwall which was hung from the existing canopy roof structure. A Fastflex fast action door and a steel pedestrian door were also supplied and installed by Westgate Global.

Westgate Global consulted with Marshalls and designed a Flexiwall solution that would partition current production and curing areas without the need for redevelopment.