
External weathering and employee spaces to enable works to continue for Wates
Hoardfast Firescreen was chosen for external weathering walls, site rooms and welfare facilities for workers during a redevelopment.

Hoardfast Firescreen was chosen for external weathering walls, site rooms and welfare facilities for workers during a redevelopment.

Dust containment was a major consideration on this project due to there being a number of surrounding shops, live cafe area on the third floor and continued access to the general public, so Marshall (Building Contractors) Ltd needed a full enclosure including a ceiling that would stop any dust contamination throughout the rest of the building.

Flexibility was key and ScS requested a solution that allowed the sides of the partition to be rolled up. In the short term this feature could provide access for any large equipment or in this case, furniture to move in and out of the area to be photographed.

Apart from cost savings Flexiwall is quicker and cleaner to install than other traditional partitioning methods and can even be reconfigured, removed or relocated should business needs evolve.

Westgate Global were required to help deliver the design, supply and installation of a temporary corridor on two levels, which would link a new pier to the existing terminal whilst the terminal extension was still being fitted out.

Aperture Group required a solution to achieve segregation between production and storage areas for dust prevention and temperature control. Wind loads also needed to be taken into account as the partition was being installed beside external shutter…

Uniroyal Global installed a Flexiwall partition to maintain temperature and humidity levels for their vehicle seat manufacturing. This energy-efficient solution provided insulation, easy reconfiguration, and ensured optimal conditions without heating the entire factory.

Discover how Westgate Global helped Multimatic create a custom storage area at their Coventry facility using Flexiwall partitions. This bespoke solution offers flexibility, minimal floor space use, and easy reconfiguration for future needs, while incorporating branding and a roller shutter door for access.

Learn how Westgate Global helped Allied Glass meet fire safety and temperature control requirements with a custom fire-rated Flexiwall partition. This solution ensured compliance with British Safety Standards while providing flexibility for future changes in their manufacturing environment.

Operating in the food and drink industry means that Kingsland Drinks must meet the requirements for BRC accreditation. Flexiwall helps with this as it is manufactured from food safe materials, delivers an over 99% dust tight seal and easily segregates production and storage areas.