
Hoardfence external site refurbishment hoarding – MTG Building Services
Hoardfence external hoarding was used during a refurbishment project, due to it’s rapid installation time and professional finish.

Hoardfence external hoarding was used during a refurbishment project, due to it’s rapid installation time and professional finish.

Dust containment was a major consideration on this project due to there being a number of surrounding shops, live cafe area on the third floor and continued access to the general public, so Marshall (Building Contractors) Ltd needed a full enclosure including a ceiling that would stop any dust contamination throughout the rest of the building.

Westgate Global were tasked with providing a partition that would deliver both temperature and odour control for Great Bear’s warehouse storage facility.

Westgate Global consulted with Marshalls and designed a Flexiwall solution that would partition current production and curing areas without the need for redevelopment.