Terex Equipment keep finished products clean with a factory partition wall Flexiwall
Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Internal freestanding hoarding was required during a project to restore the Cathedral’s organ. The organ and its pipe work needed to be dismantled and removed, whilst the Cathedral remained open for visitors.

From the start it was clear a full-height solid wall carried a number of complexities, including installation around the existing and multiple penetrations at high level.

Vision Express is one of the largest optical retailers in the UK and part of GrandVision, the global leader in optical retail operating in more than 40 countries. With almost 600 stores nationwide, Vision Express first opened its doors in Newcastle…

Westgate Global were approached to provide internal site hoarding to shield the ongoing renovations from customers as the airport remained fully open whilst the project was underway.

Westgate Global installed Flexiwall as an ideal solution for meeting BRC hygiene standards, having a dust tight seal and a unique v-overlap made it the perfect product to use for this project.

Westgate Global were tasked with providing a partition that would deliver both temperature and odour control for Great Bear’s warehouse storage facility.

A vehicle manufacturing plant approached Westgate Global with regards to relocating an existing large section of grey Flexiwall partitioning installed by Westgate Global approximately 15 years ago. The partition had previously seen a number of other…

Westgate Global provided and installed a 10m x 10m external Flexiwall which was hung from the existing canopy roof structure. A Fastflex fast action door and a steel pedestrian door were also supplied and installed by Westgate Global.

Westgate Global consulted with Marshalls and designed a Flexiwall solution that would partition current production and curing areas without the need for redevelopment.