
Hoardfence external site refurbishment hoarding – MTG Building Services
Hoardfence external hoarding was used during a refurbishment project, due to it’s rapid installation time and professional finish.

Hoardfence external hoarding was used during a refurbishment project, due to it’s rapid installation time and professional finish.

Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

Westgate Global installed Flexiwall as an ideal solution for meeting BRC hygiene standards, having a dust tight seal and a unique v-overlap made it the perfect product to use for this project.

Westgate Global were tasked with providing a partition that would deliver both temperature and odour control for Great Bear’s warehouse storage facility.

A vehicle manufacturing plant approached Westgate Global with regards to relocating an existing large section of grey Flexiwall partitioning installed by Westgate Global approximately 15 years ago. The partition had previously seen a number of other…

Westgate Global provided and installed a 10m x 10m external Flexiwall which was hung from the existing canopy roof structure. A Fastflex fast action door and a steel pedestrian door were also supplied and installed by Westgate Global.

Westgate Global consulted with Marshalls and designed a Flexiwall solution that would partition current production and curing areas without the need for redevelopment.