New warehouse workspace created with Flexiwall partitioning
“The Flexiwall installation was a thing of beauty, completed ahead of schedule with no fuss. It has made a massive difference to the working area conditions.”

“The Flexiwall installation was a thing of beauty, completed ahead of schedule with no fuss. It has made a massive difference to the working area conditions.”

Over twenty years ago, Egbert Taylor Group (the leading designer and manufacturer of recycling containers, aesthetic street furniture and galvanized steel containers for recycling and waste), called on Westgate Global to install an 80m long by 6m high partition wall in their UK warehouse. Recently they contacted Westgate Global again to relocate it.

Allport wanted to ensure that it was impossible for dust to get onto the items that they were holding in storage for their new client. Having already had a similar partition installation five years earlier, Allport re-engaged with Westgate, knowing they could trust the product to fulfil the requirements of the job and receive the usual excellent service provided by Westgate’s experienced team.

Westgate Global were tasked with providing a partition that would deliver both temperature and odour control for Great Bear’s warehouse storage facility.

A vehicle manufacturing plant approached Westgate Global with regards to relocating an existing large section of grey Flexiwall partitioning installed by Westgate Global approximately 15 years ago. The partition had previously seen a number of other…

Westgate Global provided and installed a 10m x 10m external Flexiwall which was hung from the existing canopy roof structure. A Fastflex fast action door and a steel pedestrian door were also supplied and installed by Westgate Global.

Farrall’s Group enhanced their warehouse efficiency by partnering with Westgate Global to install the Flexiwall partitioning system, creating versatile spaces for multiple uses.

Spectra Packaging, a leading manufacturer of plastic containers, sought to enhance operational efficiency by segregating their production and storage areas. They partnered with Westgate Global to install a Flexiwall partition, achieving a 99% dust-tight seal.

Hoardfast panels were installed to create a separate room for contamination control, along with Flexidoors (crash doors).

Flexicurtain was used for a washdown screen between two lines, to allow for cleaning whilst production continued.