
Amcor create a temperature controlled area for curing process
From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

From conception to completion the project was turn key managed which fully complied with Amcor’s stringent safety rules and food hygiene standards.

Westgate Global helped Hydram Engineering create a dust-tight, flexible partition with Flexiwall in their 115,000 sq ft facility. The solution provided a custom three-sided enclosure to support specialist manufacturing, with minimal floor space usage and easy reconfiguration.

Flexiwall needed to be installed between the main bottling plant and various storage areas, effectively acting as a barrier to prevent airborne dust from migrating and settling on the bottling lines. This not only complied with their H&S mandates but also improved on food and drink hygiene.

Over twenty years ago, Egbert Taylor Group (the leading designer and manufacturer of recycling containers, aesthetic street furniture and galvanized steel containers for recycling and waste), called on Westgate Global to install an 80m long by 6m high partition wall in their UK warehouse. Recently they contacted Westgate Global again to relocate it.

Westgate Global provided and installed a 10m x 10m external Flexiwall which was hung from the existing canopy roof structure. A Fastflex fast action door and a steel pedestrian door were also supplied and installed by Westgate Global.

Westgate Global consulted with Marshalls and designed a Flexiwall solution that would partition current production and curing areas without the need for redevelopment.