Terex Equipment keep finished products clean with a factory partition wall Flexiwall
Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Westgate Global were required to help deliver the design, supply and installation of a temporary corridor on two levels, which would link a new pier to the existing terminal whilst the terminal extension was still being fitted out.

From the start it was clear a full-height solid wall carried a number of complexities, including installation around the existing and multiple penetrations at high level.

Aperture Group required a solution to achieve segregation between production and storage areas for dust prevention and temperature control. Wind loads also needed to be taken into account as the partition was being installed beside external shutter…

Don & Low Ltd have over two centuries of experience and knowledge in the production of technical textiles and over 30 years of experience in Nonwoven production. Currently the company manufactures an extensive, high performing and flexible range…

Westgate Global were approached to provide internal site hoarding to shield the ongoing renovations from customers as the airport remained fully open whilst the project was underway.

Westgate Global helped Hydram Engineering create a dust-tight, flexible partition with Flexiwall in their 115,000 sq ft facility. The solution provided a custom three-sided enclosure to support specialist manufacturing, with minimal floor space usage and easy reconfiguration.

Flexiwall needed to be installed between the main bottling plant and various storage areas, effectively acting as a barrier to prevent airborne dust from migrating and settling on the bottling lines. This not only complied with their H&S mandates but also improved on food and drink hygiene.

Over twenty years ago, Egbert Taylor Group (the leading designer and manufacturer of recycling containers, aesthetic street furniture and galvanized steel containers for recycling and waste), called on Westgate Global to install an 80m long by 6m high partition wall in their UK warehouse. Recently they contacted Westgate Global again to relocate it.

Morgan Sindall had been contracted by Heathrow Airport Ltd and British Airways to modernise hangars at the West London airport in preparation for the arrival of the new airbus. This will allow greater flexibility of working space during maintenance…