
Projects
Terex Equipment keep finished products clean with a factory partition wall Flexiwall
Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Westgate Global were contacted to separate dusty fabrication from clean assembly areas using Flexiwall partitioning.

Westgate Global provided and installed a 10m x 10m external Flexiwall which was hung from the existing canopy roof structure. A Fastflex fast action door and a steel pedestrian door were also supplied and installed by Westgate Global.