Resource Hub

Insights

Effective heat load testing with temporary hot aisle containment

Westgate Global’s temporary hot aisle containment system is a robust, reusable solution for accurate heat load testing during data centre commissioning. Designed to emulate permanent hot aisle setups, it ensures optimal airflow management, accelerates commissioning timelines, and delivers reliable thermal performance data—all without damaging whitespace or creating unnecessary waste.

Learn more »
Projects

Reliable temporary aisle emulation for heat load testing for leading Data Centre partner

Westgate Global provided a trusted data centre partner with a durable and reusable temporary aisle emulation system for heat load testing. Designed to prevent collapses and reduce maintenance time, this pre-manufactured solution ensures reliable testing. Easy to install and relocate, it was successfully transported from Germany to Spain, offering consistent performance across multiple sites.

Learn more »
Projects

Custom temporary hot aisle containment panels for Winthrop Technologies

Westgate Global partnered with Winthrop Technologies to deliver a bespoke temporary hot aisle containment (HAC) solution for data centre commissioning. Using reinforced PVC panels, Westgate’s system accelerated commissioning timelines, ensured precise airflow control, and protected whitespace from damage. Reusable across multiple projects, this innovative solution reduces waste and enhances efficiency in heat load testing.

Learn more »
Projects

Contamination control for food manufacturing with Birds Eye

Due to the strong relationship with Birds Eye, Westgate Global were asked to facilitate a solution. Flexiscreen was recommended for a number of reasons, with the first of those being specific to this project: Flexiscreen can be easily installed at an angle, which is a very big advantage over conventional temporary screening methods.

Learn more »

Festive Opening Hours

Our UK offices will close on Wednesday 24th December at 3:30pm (GMT) and will reopen on Monday 5th January at 7:30am (GMT). For detailed information on final order dates, delivery schedules, and operational cut-off times, see below…