Dust control between storage and bottling lines

Flexiwall needed to be installed between the main bottling plant and various storage areas, effectively acting as a barrier to prevent airborne dust from migrating and settling on the bottling lines. This not only complied with their H&S mandates but also improved on food and drink hygiene.

Dust containment for building works during extension project for building contractor

Dust containment was a major consideration on this project due to there being a number of surrounding shops, live cafe area on the third floor and continued access to the general public, so Marshall (Building Contractors) Ltd needed a full enclosure including a ceiling that would stop any dust contamination throughout the rest of the building.

Relocation of a 20 year old Flexiwall for Egbert Taylor’s warehouse

Over twenty years ago, Egbert Taylor Group (the leading designer and manufacturer of recycling containers, aesthetic street furniture and galvanized steel containers for recycling and waste), called on Westgate Global to install an 80m long by 6m high partition wall in their UK warehouse. Recently they contacted Westgate Global again to relocate it.